🚀 Just Launched - FASS System Motor Heatsinks

Monitor your FASS Fuel Filter Life with FASS Connect!

XDP  |  SKU: XD475

XDP Remanufactured 7.3L AE Fuel Injector XD475 For 1999.5-2003 Ford 7.3L Powerstroke (8 Long Lead)

Regular price USD 16495

Can I pick up my order or have it installed at your shop?

Absolutely. We offer local pickup on most products and full professional installation at our shop in Washington, MO. Whether you just want to grab your parts or have our techs handle the install, we’ve got you covered. Give us a quick call at 636-429-7020 or message us to schedule a visit — we’ll make sure the parts are ready when you arrive.

How do I know if this part fits my vehicle?

Unsure if it’ll fit? No problem — that’s what we’re here for. Send us your vehicle’s year, make, and model, and we’ll verify fitment before you order. We can also point you toward compatible upgrades or supporting parts if needed.

What if I need to return a product or it’s defective?

Most unused items can be returned within 30 days in their original packaging. Some products are covered by a manufacturer’s warranty as well. If something arrives damaged or doesn’t meet your expectations, just let us know — we’ll help you get it replaced, refunded, or repaired. (Tracking updates are also emailed automatically once your order ships.)

What's the lead time on custom or fabricated parts?

Many of our parts are built to order — especially fabricated or performance components. These can take additional time to produce before shipping. Lead times vary by manufacturer and demand, but we’ll always keep you updated along the way. If you’re working on a tight schedule, reach out before ordering at 636-429-7020 and we’ll confirm current availability or estimated ship dates.

XDP Remanufactured 7.3L AE Fuel Injector XD475 For 1999.5-2003 Ford 7.3L Powerstroke (8 Long Lead)


This Part Fits:

Year Make Model Submodel Notes
1999 Ford F-350 Super Duty Lariat
2000 Ford F-350 Super Duty Lariat
2001 Ford F-350 Super Duty Lariat
2002 Ford F-350 Super Duty Lariat
2003 Ford F-350 Super Duty Lariat
1999 Ford F-250 Super Duty Lariat
2000 Ford F-250 Super Duty Lariat
2001 Ford F-250 Super Duty Lariat
2002 Ford F-250 Super Duty Lariat
2003 Ford F-250 Super Duty Lariat
1999 Ford F-450 Super Duty Lariat
2000 Ford F-450 Super Duty Lariat
2001 Ford F-450 Super Duty Lariat
2002 Ford F-450 Super Duty Lariat
2003 Ford F-450 Super Duty Lariat
1999 Ford F-350 Super Duty XL
2000 Ford F-350 Super Duty XL
2001 Ford F-350 Super Duty XL
2002 Ford F-350 Super Duty XL
2003 Ford F-350 Super Duty XL
1999 Ford F-450 Super Duty XL
2000 Ford F-450 Super Duty XL
2001 Ford F-450 Super Duty XL
2002 Ford F-450 Super Duty XL
2003 Ford F-450 Super Duty XL
1999 Ford F-250 Super Duty XL
2000 Ford F-250 Super Duty XL
2001 Ford F-250 Super Duty XL
2002 Ford F-250 Super Duty XL
2003 Ford F-250 Super Duty XL
1999 Ford F-450 Super Duty XLT
2000 Ford F-450 Super Duty XLT
2001 Ford F-450 Super Duty XLT
2002 Ford F-450 Super Duty XLT
2003 Ford F-450 Super Duty XLT
1999 Ford F-350 Super Duty XLT
2000 Ford F-350 Super Duty XLT
2001 Ford F-350 Super Duty XLT
2002 Ford F-350 Super Duty XLT
2003 Ford F-350 Super Duty XLT
1999 Ford F-250 Super Duty XLT
2000 Ford F-250 Super Duty XLT
2001 Ford F-250 Super Duty XLT
2002 Ford F-250 Super Duty XLT
2003 Ford F-250 Super Duty XLT
2003 Ford F-350 Super Duty King Ranch


Specifications:

Country of Origin USA
Sold As Each
Availability Available
Universal No
About

XDP is a leading retailer, distributor, and manufacturer of top-quality OE, OER, and aftermarket diesel parts and accessories. Strategically positioned across the United States, XDP houses one of the largest and most diverse diesel-specific inventories in the industry.

For the last 20 years, XDP has proudly served the diesel community and diesel industry across North America and Canada.

We're ready to meet the needs of you and your vehicle, whether it be for work, play, towing or hauling. We know what moves you!


The XDP Remanufactured 7.3L AE Fuel Injector XD475 will replace the damaged #8 Long Lead injector in your 1999.5-2003 Ford 7.3L Powerstroke. With years of manufacturing experience and over 30 million diesel fuel injectors produced to date, you can be sure you are getting a quality product.

By surpassing the manufacturers' current design specifications, these injectors have less than 0.2 percent warranty rate. Every injector is comprehensively tested for nozzle flow and needle lift as well as opening operation and leakage.

Additional tests include shot-to-shot flow meters, poppet seat leakage test, and injection timing measurements for best-in-class testing. Quality and Testing Advanced end-of-line testing, delivery, leakage and opening characteristics.

Precision remanufacturing process ensures highest quality, reliability and performance. Opening clearances are set to strict specifications; validated with engine and vehicle testing and compared to OE product.

Features:

  • Stock HP and Flow Rating
  • Best In Class End-Of-Line Testing Nozzles
  • Tested For Flow, Leakage and Needle Lift
  • In-Line Error Proofing Incorporated In Assembly Process