Industrial Injection  |  SKU: INDAEPS

Industrial Injection 99.5-02 AE Ford/Nav Powerstroke Stock Injector (#8 Cyl Long Lead Only)

Regular price USD 27462
Built to order item. Lead times are typically 2-4 weeks before shipping.

Need a more accurate estimate? Call (636) 429-7020 and our team will be happy to help.

Can I pick up my order or have it installed at your shop?

Absolutely. We offer local pickup on most products and full professional installation at our shop in Washington, MO. Whether you just want to grab your parts or have our techs handle the install, we’ve got you covered. Give us a quick call at 636-429-7020 or message us to schedule a visit — we’ll make sure the parts are ready when you arrive.

How do I know if this part fits my vehicle?

Unsure if it’ll fit? No problem — that’s what we’re here for. Send us your vehicle’s year, make, and model, and we’ll verify fitment before you order. We can also point you toward compatible upgrades or supporting parts if needed.

What if I need to return a product or it’s defective?

Most unused items can be returned within 30 days in their original packaging. Some products are covered by a manufacturer’s warranty as well. If something arrives damaged or doesn’t meet your expectations, just let us know — we’ll help you get it replaced, refunded, or repaired. (Tracking updates are also emailed automatically once your order ships.)

What's the lead time on custom or fabricated parts?

Many of our parts are built to order — especially fabricated or performance components. These can take additional time to produce before shipping. Lead times vary by manufacturer and demand, but we’ll always keep you updated along the way. If you’re working on a tight schedule, reach out before ordering at 636-429-7020 and we’ll confirm current availability or estimated ship dates.

Industrial Injection 7.3L AE Power Stroke Reman Stock Exchange Injector

Our Ford 7.3L re-manufactured injectors are built with all new internal fuel plungers, nozzles/nozzle springs and OE internal and external O-ring kits. Each oil valve is re-manufactured to OE specs and measures at .004" armature clearance (We do not shim our oil valves). After the precision assembly process, each injector is calibrated on our state of the art Hartridge HA230 injector calibrator to insure a true 4cc cylinder to cylinder fuel delivery.

Fitment Notes: #8 cylinder only 1999-2003 Ford F-Series, E-Series (Built after 12/07/98)

-Stock Replacement Injector for 1999-2003 Ford F-Series, E-Series (Built after 12/07/98) Diesels.